(Polski) Wykonanie dokumentacji na modernizację pomp na Pompowni nr 1 n/Wisłą |
(Polski) Projekt Wykonawczy z przedmiarem robót, wycena, analiza ofert, inwentaryzacja |
2016 |
Grupa Azoty PUŁAWY |
Poland |
Documentation for modernization of pressure and temperature measurement for circulation pumps in Flue Gas Desulphurization Plant |
Instrumentation Detail Engineering |
2016 |
Grupa Azoty PUŁAWY |
Poland |
Dewatering system for coal storage area in Carburization and Ash Removal Section |
Concept, Civil Detail Engineering |
2016 |
Grupa Azoty PUŁAWY |
Poland |
Electrical Equipment Building in Stalowa Wola Power Plant |
Civil and Architectural Detail Engineering, As-Built Documentation, Supervision |
2016 |
Energoprojekt Gliwice |
Poland |
Wet Flue Gas Desulphurisation Plant for cogeneration plant EC2 |
Basic Design, Civil Design |
2014 |
Grupa Azoty Zakłady Chemiczne "Police" S.A. |
Poland |
Flue-gas sulphurisation Plant |
General Design and Engineering Company, obtaining the required permits, supervision over execution of contracts with equipment vendors, General Concept, spatial layout, Civil Engineering Design, Detail Engineering in all disciplines and as-built documentation |
2013 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Preliminary environment impact analysis of a 2x800 MW Power Plant |
Environment Impact Report (coal and gas variant), Application for Integrated Permit |
2009 |
Vattenfall |
Poland |
Flue-gas desulphurisation unit in Rybnik, Poland |
Detail Engineering and As-built documentation for Flue gas wet desulphurisation unit at the Rybnik Power Plant, supervision |
2007 |
Energoprojekt Gliwice S.A. |
Poland |
Boiler supporting steel structure for Lozanna, Switzerland |
Detail Engineering |
2004 |
MOSTOSTAL Puławy S.A. |
Poland |
Demineralized water unit for heat/power plant |
Capacity – 600 mtpd Technical/economical analysis |
2000 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Process condensate degassing |
Capacity – 29 mtph of condensate Detail Engineering |
2000 |
ANWIL S.A. Włocławek |
Poland |
Oil-based Boiler House - Revamping |
Capacity – 8 MW Medium – steam 20 mtph 1,2 MPa Detail Engineering |
1999 |
Zakłady Farmaceutyczne ICN Polfa Rzeszów |
Poland |
Liquid Fertilizers Terminal Oil-based boiler house |
Capacity – 1 100 kW Medium – water 80°C Civil Engineering Design, Detail Engineering |
1998 |
Bałtycka Baza Masowa – Port Gdynia |
Poland |
EPCM for the construction of a new 400 MWe gas unit project |
Conducting the proceedings for the selection of the Technical Advisor and the General Contractor of the project |
2017 |
Elektrownia Puławy Sp. z o.o. |
Poland |
Designing of new electrical equipment in 6kV distribution cabinet |
Multi-discipline Detail Engineering, Procurement: inquiries, technical evaluation of proposals, technical attachments to contracts; As-Built Documentation. |
2017 |
Grupa Azoty PUŁAWY |
Poland |
Preparing balance of the crystallization section of the flue-gas desulphurization plant |
Inventory taking of the crystallization section and update of PIDs, mass and heat balance of the plant section. |
2017 |
Grupa Azoty PUŁAWY |
Poland |
Replacement of 9.6 Mpa steam manifold in power plant |
Process Design, multi-discipline Detail Engineering, pipeline inventory taking, equipment registration files, cost estimates. |
2017 |
Grupa Azoty PUŁAWY |
Poland |
Flue-gas scrubbing plant and EC II Power Plant revamping |
Replacement Civil Design, multi-discipline Detail Engineering within the agreed scope, 3D model of the building, equipment, cable trays, preparation of process diagram. |
2018 |
Grupa Azoty POLICE |
Poland |