Shopping Mall Taganka in Moscow
Project outline
- Floor space – 4 200 m2
- Cubic capacity – 18 350 m3
Scope of work
The scope of work included preparing engineering documentation encompassing:
- foundations
- architectural design
- basic designs for manufacturing the main steel structure manufactured by B.P. Mostostal Siedlce
- steel structures supporting walls and roofs
- water and sanitary systems
- central heating, HVAC,
- procurement management for ventilation and air conditioning equipment
- electrical and telecommunications networks
- audio system, CCTV,
- fire alarm and sprinkler systems
- author’s supervision