Shopping Mall Taganka in Moscow

Project outline

  • Floor space – 4 200 m2
  • Cubic capacity – 18 350 m3

Scope of work

The scope of work included preparing engineering documentation encompassing:

  • foundations
  • architectural design
  • basic designs for manufacturing the main steel structure manufactured by B.P. Mostostal Siedlce
  • steel structures supporting walls and roofs
  • water and sanitary systems
  • central heating, HVAC,
  • procurement management for ventilation and air conditioning equipment
  • electrical and telecommunications networks
  • audio system, CCTV,
  • fire alarm and sprinkler systems
  • author’s supervision