To jest po angielsku. |
Połączenie instalacji mocznika, azotu z instalacją produkcji RSM. Ogrzewany rurociąg mocznika o dł. około 2 000 m. Projekt Podstawowy, Projekt Wykonawczy, inne usługi inżynieryjne |
1987 |
Zakłady Azotowe "Puławy" S.A. |
Polska |
Urea prilling tower |
Capacity 2000 mtpd, Basic Design, Civil Design Engineering, |
1993 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Urea prill tower exit air CLEANING UNIT |
Capacity – 2 000 mtpd of granulated product Basic Design, Detail Engineering |
1993 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Urea prill tower exit air CLEANING UNIT |
Capacity – 1 400 mtpd of granulated product Detail Engineering, procurement |
1993 |
CHEMIE LINZ |
Ausria |
Instalacja oczyszczania powietrza z wieży granulacyjnej mocznika |
Wydajność - 500 t/d granulatu Projekt Podstawowy, Projekt Wykonawczy |
1995 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Detail Engineering for Urea Synthesis Unit |
Capacity – 1 700 mtpd, Cooperation – TECNIMONT (Italy), Civil Engineering Design, Detail Engineering |
1998 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Urea solution filtration for melamine production |
Detail Engineering, supervision |
1999 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Bulk Fertilizer Storage and UAN Terminal |
UAN Storage capacity – 27 000 t., Bulk Fertilizer storage capacity – 140 000 m3, Loading/Unloading capacity – 2000 mtph, Civil Engineering Design, Detail Engineering |
1999 |
Bałtycka Baza Masowa – Port Gdynia |
Poland |
Hydrolysis section processing capacity boost |
Detail Engineering, supervision |
1999 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Integration of melamine plant with urea plants |
1. Integration of Melamine II with two IDR lines 2. Integration of Melamine III with two IDR lines Basic Design, Detail Engineering, other engineering services |
2000 2003 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Integration of melamine plant with urea plants |
1. Integration of Melamine II with two TOYO lines 2. Integration of Melamine III with two TOYO lines Basic Design, Detail Engineering, other engineering services |
2000 2003 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Ammonia emission reduction through acid absorption |
Basic Design, Detail Engineering, other engineering services |
2001 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Urea prill tower exit air CLEANING UNIT |
Feasibility Study |
2003 |
Undisclosed |
Poland |
Production unit for granulated fertilizers (on the basis of waste materials) |
Environment impact report Civil Engineering Design with Building Permit |
2006 |
Zakłady Chemiczne ALWERNIA S.A |
Poland |
AdBlue production unit |
AdBlue capacity increase from 30 000 mtpy to 100 000 mtpy. Civil Engineering Design, Detail Engineering, Environment impact report with an environment conditions application. |
2008 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
TOYO urea plant revamping |
Revamping (capacity boost) of TOYO urea production trains, Civil, Engineering Design, Detail Engineering in all disciplines according to Basic Design by Urea Casale, Supervision, Start-Up. |
2009 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Urea prill tower exit air CLEANING UNIT |
Basic Design, Detail Engineering, procurement, operating manual, supervision, other engineering services |
2009 |
SABIC |
Saudi Arabi |
The concept for production line of granulated fertilizer with supplements |
General concept |
2009 |
Undisclosed |
Undisclosed |
IDR Urea Plant revamping acc. to Urea Casale Basic Design |
IDR urea plant production capacity increase. Civil Engineering Design, Detail Engineering, other engineering services |
2010 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
The concept for production line of liquid fertilizer with supplements |
General concept |
2011 |
Zakłady Azotowe "Puławy" S.A. |
Poland |
Urea plant revamping |
Feasibility Study |
2013 |
Grupa Azoty, Zakłady Azotowe Kędzierzyn S.A. |
Poland |
Solid fertilizers production plant with storage and loading facilities |
Civil Design and Environmental Impact Report, Detail Engineering in all disciplines for the storage and loading complex |
2014 |
Grupa Azoty, Zakłady Azotowe "Puławy" S.A. |
Poland |
Fertilizer Research Center |
Process Design, Basic Design, Detail Design and As-Built documentation, supply of equipment, Supervision |
2014 |
INS - New Chemical Syntheses Institute |
(Polski) Polska |
Technical Grade Urea plant |
Process Design, Basic Design, Detail Engineering, Procurement, Supervision |
2014 |
SABIC |
Saudi Arabia |
Replacement of 6kV electric motors of ammonia and ammonium carbamate pumps in urea plant for 400 V drives with application of frequency inverters |
Documentation necessary to obtain all the required decisions, multi-discipline Detail Engineering, Procurement: inquiries, technical evaluation of proposals, technical attachments to contracts; supervision. |
2017 |
Grupa Azoty PUŁAWY |
Poland |
Product classification system |
Concept, Cost Estimates |
2016 |
Undisclosed |
Poland |
Urea Plant Revamping |
Civil Design, Detail Engineering |
2017 |
Grupa Azoty ZAK |
Poland |
Modernization of the filtration system of the circulating solution from the urea plant scrubbers |
Multi-discipline Detail Engineering, Procurement: inquiries, technical attachment to the contract |
2017 |
Grupa Azoty PUŁAWY |
Poland |
Development of interlock system; evaluation and selection of safety valves on all pipelines in urea plant |
Concept, cost estimates |
2018 |
Grupa Azoty PUŁAWY |
Poland |
Replacement and modernization of the stripper in urea synthesis section |
Replacement and modernization of the stripper in urea synthesis section |
w trakcie/in progress |
Grupa Azoty PUŁAWY |
Poland |