Investment task Description Year Costumer Location
NOx compressor Documentation necessary to obtain all the required decisions, Process Design and multi-discipline Detail Engineering, Procurement: inquiries, technical evaluation of proposals, cost estimates, technical attachments to contracts; As-Built Documentation, supervision. w trakcie/in progress Grupa Azoty PUŁAWY Poland
Modernization of the OP-215 steam boiler to reduce NOx emissions Application for administrative decision on environmental conditions 2017 Grupa Azoty PUŁAWY Poland
ALKAT Air Separation Unit Civil Design, Detail Engineering 2017 Air Liquide Global E&C Solutions Poland Poland
Procurement of equipment to produce sliced solid CO2 Documentation required for obtaining administrative decisions; multi-discipline Detail Engineering, Procurement: inquiries, technical evaluation of proposals, technical attachments to contracts, reviewing and evaluation of documentation, cost estimates; equipment registration files. 2017 Grupa Azoty PUŁAWY Poland
CO production capacity increase Concept, Cost Estimates, Preparation of Material Requisition 2016 Grupa Azoty PUŁAWY Poland
CO capacity increase and optimization of 2 liquid carbon dioxide disposal in Ammonia Plant Environment Impact Report, Application for obtaining enviromental authorities decision 2016 Grupa Azoty PUŁAWY Poland
Air separation unit. Two trains of overall capacity 1700 mtpd Process by Air Liquide. Concept, Civil Engineering Design, Detail Engineering, procurement, operating manual 2010 Zakłady Azotowe "Puławy" S.A. Poland
Gaseous chlorine piping Steel pipeline with valving/fittings. Detail engineering documentation and Registration File. Settlements with UDT 2004 APAKOR-ROKITA Brzeg Dolny Poland
Purification of carbon dioxide from Benfield Unit Detail Engineering, engineering documentation, supervision, as-built documentation 2003 ANWIL S.A. Włocławek Poland
Oxygen Plant General concept and spatial layout, feasibility study 2001 Zakłady Azotowe "Puławy" S.A. Poland